Solano Irrigation District Corporation Yard

This 57,000 square foot district operations maintenance facility includes a two-story office building, mechanical shop, pump and meter shop, welding shop, hazardous materials shop, and weed control.
The project used a hybrid design-bid-build delivery with bidding to a select list of three pre-selected general contractors and required prevailing wage. The contract was guaranteed maximum price (GMP). Completed in 2011.

 

1090 Piper Drive, Vacaville, CA

Client: County of Solano