Fair Oaks Presbyterian Church Addition
In recognizing the importance of Youth & Children’s Ministry, the Fair Oaks Presbyterian Church has recently launched its G2G building campaign. Generation 2 Generation (G2G) is about replacing dilapidated portables and outdated classrooms with a more modern facility to help youth and children build a stronger relationship with our Lord and Savior.
The new facility is a 40,000 square foot two-story building located behind existing Church Facilities. The ground floor is dedicated to Children’s Ministry with pre-school classrooms, elementary school classrooms, assembly spaces and Administrative support. The second floor holds two large assembly spaces; one for Jr High Ministry and the other for Sr High Ministry. In addition to the assembly spaces, the FOPC has consolidated all Administration Functions into a suite on the second floor to better serve the Church Community. A large courtyard links the existing facilities into a comprehensive whole providing a children’s play area, and large outdoor gathering spaces for services and events.
11427 Fair Oaks Boulevard, Fair Oaks, California
Client: Fair Oaks Presbyterian Church